Canyon Technical Services

Canyon Technical Services (Now Trican Well Service), Clairmont

Project Overview

  • TurCon built a strong relationship with Canyon Technical Services, construction 3 buildings and 1 addition at their Clairmont Location.

Project Highlights

  • TurCon built two 20,000 sq/ft Office/Shop Buildings, 1 Chemical Storage Building and then Added onto the Chemical Storage Building later on.
  • Both Shops consisted of  6 Bays including; mechanic bays and service trenches, 2 cranes, parts rooms and storage as well as 2 wash bays.
  • The office portions were both 5,000 sq/ft and included large boardrooms, multiple offices and large change room areas.